
MSW Landfill Risk Assessment & Remediation
填埋场环境污染隐患风险评估与治理
Following the Technical Guideline for Environmental Risk Assessment and Remediation of MSW Landfills (Doc. No. 60/2025) jointly issued by MOHURD and MEE in Dec 2025, SENEVEN provides full-chain professional services covering hazard inspection, risk grading, site-specific remediation planning, and long-term monitoring for landfill owners across China.
Overview
The service framework covers all 8 risk factors defined in the national guideline (4 safety + 4 environmental). SENEVEN holds proven competence in the two highest-weighted environmental factors—leachate leakage and groundwater contamination—and serves as third-party assessor, remediation planner and long-term compliance support.
Principle
Methodology: dual-track grading combining "key-factor screening" with composite scoring on a 100-point scale. Safety hazards weighted 40 points across 4 sub-factors, environmental hazards weighted 60 points across 4 sub-factors. SENEVEN deployment: (1) leakage detection per ASTM D7007 / D8265; (2) HRSC framework for groundwater investigation; (3) tiered long-term monitoring—PLLS (Permanent Leak Location System) pre-embedded for new builds, online water-quality + leachate level systems for legacy sites.
Features
- Aligned with MOHURD/MEE Doc. No. 60/2025 latest methodology
- 8-factor scoring + key-factor threshold dual judgment
- Leakage detection per ASTM D7007 / D8265, 1 mm resolution
- Groundwater investigation via HRSC framework + 3D plume inversion
- Site-specific (one-site-one-strategy) remediation planning
- Long-term monitoring: PLLS (Permanent Leak Location System) pre-embedded for new builds; online water-quality + leachate level systems for legacy sites
- Helps clients meet provincial filing deadline of Apr 30, 2026
Scenarios

Risk Grading Assessment

Site-Specific Remediation Plan
